Housing & Commercial Construction,

Land Development Excavation

Red Barn Ridge specializes in total ESC Site Management, performing “Weekly” and “Rain Event” inspections and providing recommendations

 

 

Red Barn Ridge inspects the entire site for compliance with local, state PCA and federal EPA regulations and your Storm Water Pollution Prevention Plan (SWPPP) requirements. 

 

¨ Site Management of Erosion & Sediment Control

 

¨ Inspections are performed by a certified individuals

 

¨ The findings are reviewed by ESC manager

 

¨ Electronic detailed inspection records generated for customers and archived

 

¨ Inspection recorded and kept on site after each inspection

On-Site Document Storage Canisters:

 

Red Barn Ridge document canisters are durable and are designed to quickly attach to T- posts and provide on-site storage for the PCA required documents.

 

Off-Site Electronic Documentation and Archiving:

 

Red Barn Ridge utilizes a robust, secure, electronic documentation and archiving system. This system is an E-based Stormwater documentation and data storage system. This system is utilized by engineering firms, municipalities , and DOTs.

         Red Barn Ridge Trademark Inspection Services

 Red Barn Ridge - FARGO MOORHEAD area developers and builders have the services of Red Barn Ridge available in a local co-operative effort with JT Lawn.  While both companies have a long history of providing customers with great service at fair prices, customers have asked for more. 

 

Customers now have all of their erosion control compliance needs readily available.

   Services packages tailored to meet each customers needs.

 

Red Barn Ridge - FM       

        * Stormwater Plans

        * Documentation amendments

        * Inspection - per NPDES and local jurisdiction requirements

 

JT Lawn

        * Landscaping

        * Stabilization

        * Inlet Protection Installation & Maintenance

        * Perimeter control

         & all the great services you are use to receiving and more

 

- FM

SPECIAL NOTE:

 

The MPCA issued a revised construction permit in 8-1-2008.  There are a number of significant changes.  Red Barn Ridge has enhanced services to help the industry comply.  Here are just a few of the new requirements

¨ Focused Training requirements for Inspectors, Installers, SWPPP generation  (see Training page)

¨ SWPPP requires much greater detail

¨ Onsite infiltration required during construction

¨ Concrete washout areas requirements

¨ Stabilization timing

¨ Stabilization processes

¨ Documentation filing timelines