Minnesota Pollution Control Agency MPCA, Environmental Protection Agency EPA, Minnesota Department of Transportation MnDot, Approved Product List, North Dakota Department of Health, National , Pollutant Discharge Elimination System/State Disposal System NPDES/SDS Permit Construction Stormwater General Permit, National Water Quality Inventory, stormwater runoff,  subdivision registration, Notice of Termination NOT, General Stormwater Application Permit, AGC, Permit Transfer/modification form Construction Stormwater Permit Online, Notice of Intent, Knife River, Brock White, Central Landscaping, silt fence, rock checks, rain gardens, sediment ponds, stormwater inlets, rapid stabilization, temporary stabilization, TRM, straw mulch, straw blankets, inlet protection, Wymco, ESS Brothers, concrete washout, down gradient protection, rock logs, permanent stabilization, Clean Water Act, Environmental Services, state projects, Excavators, Prime Contractors, STIP, APO, Administrative Penalty Order, Joint Powers Agreement, NPDES Phase II, NPDES Phase III, University of Minnesota Erosion Certification Courses, Inspector/Installer, Site Management, Recertification seeding, mulching, silt fence placement, topsoil placement, erosion control blanket installation, riprap placement, silt curtain, inlet protection, culvert installations, Crew supervisor, turf establishment, seeding contractor, grading contractor, bridge contractor, installing temporary erosion/sediment control devices, Erosion Control Suppliers, MECA, Minnesota Erosion Control Association, CMBA, BATC, MN, certified, training,

Home

                                                 Photo  courtesy of Lumber One

Erosion & Sediment Control (ESC) Supervisor

Many complex MnDOT projects require an ESC Supervisor to be appointed. The ESC Supervisor is responsible for the overall site management of all ESC activity.  In addition to the core responsibilities of  Weekly and Rain Event Inspections, our service includes  Site Planning, ESC installation scheduling and co-ordination…..

    Read more

Construction Stormwater Permit

Residential and Commercial construction projects disturbing over one acre of soil or are part of a larger common plate must have a MPCA Construction stormwater permit. Red Barn Ridge specializes in the required stormwater inspections and documentation.  Red Barn Ridge conducts “Weekly” and “Rain Event” inspections and provides the clients with the most cost effective ESC options.

Read more

       MS4 Permit Management

(Municipal Separate Storm Sewer System) To date, in MN, there are 191 communities designated by the MPCA as MS4s.  Each MS4 community must comply with the required 6 minimum control measures and at least 31 sub measures.  Red Barn Ridge’s services can help with your SWPPP development , public education, compliance inspections, documentation and training.   

Read more

Text Box: RBR Training Courses offered
2008/2009
MN Certification for Inspectors